History: The beginning of the built-up of the raiwaystation has a history in 1912. It was built in stages until the 40th. years of 20th century. The original main line was from the Liptovský Hrádok trough the Čierny Váh, Liptovská Teplička to the Rovnianok-Záturne under the Kraľova Hoľa. The line had 42 km. The dead ended line were Svarin, Nižný Chmelienec, Vyľný Chmelienec, Ráztoky, Dikula, Benkovo.
The Považská logging railway has the second one length in Slovakia and the nature around was the most beautifull in the middle of Europe.
Price of admission:
Adults 80,-Sk
Children 40,-Sk
Cultural events 120,- / 60,-










